'Public Works': Closure of Road 207 towards Al-Ghawath Roundabout
Qiyas summary
Ministry of Public Works announces closure of Road 207 for maintenance works from October 24 to November 14
Translated by Qiyas from السياسة — Original source
- Effective from dawn on Saturday until November 14
The Ministry of Public Works, in coordination with the General Directorate of Traffic, announced the closure of Road 207, the connector extending from the intersection of Road 5 and Road 101 to Al-Ghwaiba Roundabout, in the direction of Al-Ghwaiba Roundabout, starting from dawn on Saturday, October 24, 2026, until November 14, 2026.
The Ministry clarified that the closure is intended to carry out demolition works, earthworks, and asphalt paving.