Minister of Public Works Inspects Mushraf Station to Ensure Readiness and Safe Operation
Dr. Noura Al-Mashaan inspected the Mushraf wastewater pumping station to verify its readiness and safe operation at full capacity.
Translated by Qiyas from السياسة — Original source
Al-Mushaan: We are committed to ensuring the continuity of wastewater services in accordance with the highest standards of efficiency and safety
Public Works Minister Dr. Noura Al-Mushaan inspected the Mishref wastewater pumping station today, Thursday, to review ongoing operations and verify its readiness and safe operation at full capacity.
In a statement to the media on the sidelines of the tour, Al-Mushaan emphasized that the Mishref station is a vital facility serving a large number of residential areas, stressing the Ministry’s commitment to field monitoring of its readiness to ensure uninterrupted service delivery in line with the highest standards of efficiency and safety.
During the visit, the Minister toured the station’s facilities and operational systems, and listened to a detailed briefing from the technical team on operational procedures, safety protocols, and the efficiency and capacity of the pumps and equipment to operate at full capacity.
Accompanying Al-Mushaan during the visit were Acting Deputy Minister of Public Works Kifaya Al-Najdi, Director General of the General Directorate of Health Engineering Affairs Engineer Anwar Al-Balushi, as well as the technical staff responsible for operating the station.