Transfer of Ministry of Electricity Staff According to Sector Needs
Staff transfers have been carried out and specifications for Geographic Information Systems (GIS) have been approved.
Translated by Alqyas from Al-Seyassah — Original source
Sources close to the Ministry of Electricity, Water, and Renewable Energy revealed that the Administrative Affairs Department has contacted various sectors of the ministry regarding the opening of the transfer window for employees to and from the department, enabling them to submit their preferences to the relevant committee.
At the same time, the sources indicated that work continues between Administrative Affairs and the various sectors to enter employees’ annual performance evaluations, in preparation for disbursing excellence awards to eligible staff.
On another note, Undersecretary Dr. Adel Al-Zamil issued a directive instructing the Planning, Training, and Information Systems Sector to be responsible for reviewing the technical specifications of Geographic Information Systems (GIS) for all ministry projects when they are included in the projects’ technical specifications.
The directive mandated all ministry sectors with access and modification rights to GIS systems to carry out necessary updates to existing assets associated with these systems, as well as immediate updates for assets that will be linked to these systems in the future.
It called on all ministry sectors to coordinate with the Planning, Training, and Information Systems Sector and to adopt the technical specifications for GIS when preparing tender documents and technical studies for projects.
The directive emphasized the inclusion of a representative from the Planning, Training, and Information Systems Sector, specializing in GIS, in the preliminary and final acceptance committees for relevant projects. It also required the inventory of existing assets for these systems and providing the sector with all current data related to them. Furthermore, prior coordination with the sector is required when drafting specifications for equipment and devices used in field surveys during contract preparation and signing, and these specifications must be approved by the Planning, Training, and Information Systems Sector before any procurement or supply process takes place.
It also highlighted the necessity of requiring ministry sectors to provide the sector with the names and details of surveyors and technical draftsmen nominated to work on field survey projects supervised by the ministry’s sectors, so they can undergo technical competency assessments before being appointed under the signed contracts. This is to address all deficiencies and incomplete data regarding the ministry’s electricity and water networks and assets linked to its GIS, ensuring their readiness for operation and integration with the Electric Distribution Network Management System (DMS), in accordance with the standards approved by the Planning, Training, and Information Systems Sector.