Minister of Public Works Inspects Maintenance Works on King Faisal Bin Abdulaziz Road
Press coverage 2 newspapers covered this event: Al-Qabas · Kuwait News →
Public Works Minister Noura Al-Mashaan inspected maintenance works on King Faisal Bin Abdulaziz Road accompanied by Khalid Dhaawi Al-Asimi, Director General of the General Administration of Road Engineering Affairs, emphasizing the priority of improving road efficiency.
Translated by Alqyas from Kuwait News — Original source
Public Works Minister Dr. Noura Al-Mashaan inspected on Wednesday the works of the King Faisal bin Abdulaziz Road (50) maintenance project, accompanied by the Director General of the General Administration of Road Engineering Affairs, Engineer Khaled Dhaoui Al-Asimi, where she reviewed the progress of ongoing activities at the site.
During the tour, Al-Mashaan followed the laying of the subgrade layer, asphalt works, and the construction of stormwater drains, as part of the project phases aimed at enhancing the road’s efficiency and improving traffic flow.
In a press statement after the tour, Al-Mashaan emphasized that the Ministry prioritizes the maintenance of major roads due to their critical role in enhancing the efficiency of the road network and strengthening traffic safety. She stressed the necessity of adhering to technical specifications throughout all implementation stages, from subgrade construction to asphalt laying and stormwater drainage.
She added that continuous field supervision is being conducted to ensure the quality of execution and the completion of works in accordance with approved plans, calling on road users to comply with traffic guidelines in the vicinity of work sites to safeguard their safety and that of the workers.