'Public Works' Continues Maintenance Works to Improve Road Efficiency

The Ministry of Public Works announced the continuation of asphalt paving works and improving road efficiency, with announcements of partial and full closures of some roads in cooperation with the Traffic Department.
Translated by Alqyas from Al-Jarida — Original source
The Ministry of Public Works announced the continuation of asphalt paving works on King Faisal Road, at the exit ramp of the Sixth Ring Road heading toward Al-Jahra, as part of major asphalt maintenance contracts aimed at enhancing the efficiency and condition of the road network.
In a statement issued today, the ministry said the works involve laying asphalt layers in accordance with maintenance and rehabilitation requirements, contributing to addressing signs of deterioration and wear on the road, improving the quality of the surface layer, and preparing the road to better accommodate traffic flow.
The ministry emphasized its commitment to adhering to quality standards and approved technical specifications in executing asphalt paving works, through monitoring implementation stages and verifying the quality of materials used and their compliance with technical requirements, via the ministry’s technical teams. This ensures the efficiency of maintenance works and the durability of asphalt layers, helping to extend the road’s expected service life and reduce the need for frequent maintenance interventions.
Meanwhile, the Ministry of Public Works, in coordination with the Traffic Department, announced a complete closure of Riyadh Road (50) heading toward the airport, from the Fourth Ring Road intersection opposite the Al-Khalidiya area, for asphalt maintenance works.
The ministry stated in a statement that the closure will begin at dawn tomorrow (Friday) and last until dawn on the following Sunday.
In a separate development, the Ministry of Public Works, in collaboration with the General Directorate of Traffic, announced the opening of part of the right and middle lanes on King Faisal Road (50) heading toward the airport, in the direction of the Khaitan area, alongside the opening of the parallel exit for Khaitan leading to Abu Dhabi Street, as well as the activation of a traffic signal and the two branches of Khaitan Club Street heading toward the airport.
Concurrently, a partial closure of the right and middle lanes for traffic coming from the city toward the airport, as well as the exit leading to the Sixth Ring Road heading toward Al-Jahra and Al-Musaylah, will remain in effect from dawn tomorrow (Saturday) until dawn on Friday, December 11.