Kuwait Press Memory Latest news
aljaridaLocal By سيد القصاص

Public Works: Road Maintenance to Approved Specifications

Public Works: Road Maintenance to Approved Specifications

The Ministry indicated that the works scheduled until the 13th of the current month include the Abdali Road, the intersection of the Fourth Ring Road with Morocco Road, Al-Fahahil Road (opposite Mushrif - Salwa), the overpass at the Fourth Ring Road intersection heading toward Salmiya, Al-Subayya Road, the Fourth Ring Road from the Morocco Road intersection to the Damascus Street intersection, the Salmiya Road toward Kuwait, and the Seventh Ring Road from kilometer 24 to 27 in both directions.

The Ministry clarified that works in the Ahmadi Governorate cover the areas of Jabir Al-Ali, Blocks 6 and 8, as well as Block 1 in Al-Raqqa, and Blocks 1 and 2 in Abu Halifa.

It added that in the Jahra Governorate, works include Block 9 in the Saad Al-Abdullah area. In the Mubarak Al-Kabeer Governorate, works cover Block 2 in the Mubarak Al-Kabeer area, Blocks 1, 2, 3, 4, and 5 in Al-Qurain, Blocks 5, 6, and 7 in Al-Qasour, Blocks 1, 2, and 5 in Abu Futeira, Block 3 in Al-Fanitees, and Block 2 in Al-Adan.

It noted that in the Capital Governorate, works include the areas of Al-Qirwan from Block 1 to 3, Al-Nuzha from Block 1 to 3, and Abdullah Al-Salem Suburb, Block 1.

It mentioned that works include Block 2 in the Mubarak Al-Kabeer Governorate, Al-Qurain from Block 1 to 5, Al-Qasour Blocks 5, 6, and 7, Abu Futeira Blocks 1 to 5, Al-Fanitees Block 3, and Al-Adan Block 2.

It clarified that in Hawalli, works cover the areas of Jabriya, Salmiya (all blocks), Mubarak Al-Abdullah, Al-Sadiq, Bayan Palace, Mushrif, Salwa, Bayan, and Hawalli. In the Farwaniya Governorate, works include the residential areas of Al-Aridya, Jaleeb Al-Shuyoukh, Seville, and Kitan.

Latest news Original source
Link copied ✓