Minister of Public Works Inspects Mushref Station: Ensuring Service Continuity According to Highest Efficiency and Safety Standards
&cropxunits=450&cropyunits=338&w=770)
Dr. Noura Al-Mashaan inspected the Mushref wastewater pumping station with ministry deputies to ensure readiness
Translated by Qiyas from الأنباء — Original source
Darine Al-Ali
Public Works Minister Dr. Noura Al-Mashaan conducted an inspection visit to the Mishref wastewater pumping station to monitor ongoing operations and ensure its readiness and safe operation at full capacity.
Accompanying Minister Al-Mashaan during the visit were the Acting Undersecretary of the Ministry of Public Works, Kifaya Al-Najdi, and the Director General of the General Administration of Sanitary Engineering Affairs, Eng. Anwar Al-Balushi, along with the technical team responsible for operating the station.
In a press statement, the ministry said that Minister Al-Mashaan toured the station’s facilities and operational systems, and listened to a detailed briefing from the technical team on operational procedures and safety protocols, as well as verifying the efficiency of pumps and equipment and their ability to operate at full capacity.
Speaking to the media on the sidelines of the tour, Al-Mashaan emphasized that the Mishref station is a vital facility serving a large number of residential areas, stressing the ministry’s commitment to field monitoring of the station’s readiness to ensure continuous service delivery in accordance with the highest standards of efficiency and safety.