Minister of Public Works inspects Mushref station: Monitoring readiness to ensure continuous service according to highest efficiency and safety standards

Dr. Noura Al-Mashaan inspected the Mushref wastewater pumping station with ministry deputies to verify operational readiness.
Translated by Qiyas from الأنباء — Original source
Public Works Minister Dr. Noura Al-Muqdad conducted an inspection visit to the Mishref wastewater pumping station to monitor ongoing operations and ensure its readiness and safe operation at full capacity.
Accompanying Minister Al-Muqdad during the visit were Acting Undersecretary of the Ministry of Public Works Kifaya Al-Najdi, Director General of the General Administration of Sanitary Engineering Affairs Eng. Anwar Al-Balushi, as well as the technical team responsible for operating the station.
In a press statement, the ministry said that Minister Al-Muqdad toured the station’s facilities and operational systems, and received a detailed briefing from the technical team on operational procedures and safety protocols, verifying the efficiency of the pumps and equipment and their ability to operate at full capacity.
Speaking to the media on the sidelines of the tour, Al-Muqdad emphasized that the Mishref station is a vital facility serving a large number of residential areas, stressing the ministry’s commitment to field monitoring of the station’s readiness to ensure continuous service delivery in accordance with the highest standards of efficiency and safety.