Closure of Street 110 in Block 5 and Street 130 in Block 2 in Qurtaiba from Saturday, the 5th of this month, for a period of 10 days

Alqyas summary
The Ministry of Public Works, in cooperation with the Ministry of Interior, announced the closure of Street 110 in Block 5 and Street 130 in Block 2 in the Qurtaiba area for asphalt works, effective from Saturday, the 5t
Translated by Alqyas from Al-Anba — Original source
The Ministry of Public Works, in cooperation with the Ministry of Interior, announced the closure of Street 110 in Block 5 and Street 130 in Block 2 in the Qurtaiba area for asphalt works, effective from Saturday, the 5th, until Tuesday, the 15th.